Premier AV Solutions for New York City Events

Built for the City That Never Sleeps
From Fashion Week galas to UN summits, NYC timelines are brutal. PEAK’s NE warehouse feeds the 3.3-million-sq-ft Javits Center via same-day courier and runs pre-cabled disguise racks into Cipriani’s landmark domes before Wall Street’s closing bell.
Key Spaces on Our CAD Roster
- Javits Center (expanded West building & rooftop farm)
- Cipriani Wall Street, 42nd Street & 25 Broadway
- The Shed (McCourt Hall) & The Glasshouse
- Pier 36 & Brooklyn Navy Yard stages
Signature Capabilities
- 360° column-mapping inside historic domes
- Broadcast-quality fiber links to Times Square screens
- LEED-compliant power solutions for landmark sites
- On-site spare LED tiles to beat union down-time penalties
Whether it’s a 1,300-guest Cipriani gala or a 40,000-attendee Javits expo, PEAK delivers Broadway-ready production values with Wall Street precision.
our expertise
Featured Venues
Key Statistics
FAQ
Who handles union labor in NYC?
PEAK crews through IATSE Local 1, the nation’s oldest stage-hand local, covering Javits, Cipriani and more.
What are the Javits Center dock specs?
Three ramped docks on Level 1 accept standard trailers, with freight doors up to 19’ 7” high.
Is there enough bandwidth for hybrid events?
Javits runs dual 10 Gbps, dual-homed internet pipes with load balancing and campus-wide Cat-6 infrastructure.
What are the ceiling load limits?
Space-frame nodes in Halls 1A/1E are limited to 50 lbs per point; recessed deck tabs in 1B/1C allow 100 lbs per point. PEAK designs on 8-ft grids to stay within spec.
How quickly can PEAK respond to late adds?
Our Long Island City warehouse is one subway stop from Javits; spare LEDs or cameras can hit the docks in under 30 minutes.