Atlanta’s Go-To Partner for Large-Scale AV

Rapid Deployment in the Southeast
Our Atlanta field team sits steps from the Georgia World Congress Center’s 4.1-million-sq-ft championship campus —the 4th-largest convention center in the U.S.—and is pre-badged for overnight rigging. Need stadium scale? We integrate halo-board graphics at Mercedes-Benz Stadium and route feeds to Centennial Olympic Park for outdoor overflow.
High-Impact Venues Covered
- Georgia World Congress Center (Halls A–C)
- Mercedes-Benz Stadium (club levels & field)
- Cobb Galleria Centre & Cobb Energy Centre
What We Deliver
- 100-ft ROE Black Pearl LED backdrops
- L-Acoustics K2 arena arrays & Dante networking
- Scenic fabrication & kinetic reveals
- 24/7 show-caller & union-crew coordination
Atlanta’s nonstop convention calendar demands reliability—PEAK’s redundant fiber fly-packs keep your keynote live even if the grid blinks.
our expertise
Key Statistics
FAQ
Which union local supplies Atlanta stagehands?
We work through IATSE Local 834, the city’s exhibit-and-trade-show local.
How big are the GWCC dock doors?
Building C’s new C4D dock door measures 24’ W × 16’ H, and north/south ramps span 74–75 ft for easy semi access.
Is high-speed internet available?
Yes—exclusive provider CCLD offers dedicated fiber and custom wireless networks campus-wide.
What are the rigging requirements?
All ceiling loads require GWCC engineering review; PEAK submits stamped drawings and manages on-site inspections per the Facility User Guide.
How fast can extra gear arrive?
Our Midtown depot is 10 minutes from Hall B docks; extra consoles can be on the floor in under an hour.